About
Hardware
Aerial Mapping
BIM Systems
Excavating Systems
Field Controllers
GNSS Antennas
GNSS Boards
GNSS Radios
GNSS Receivers
Grading Systems
Lasers
Laser Scanning
MC Control Boxes
MC Sensors
Mobile Mapping
Optical Instruments
Optical Instrument Accessories
Paving Systems
Software
Field Applications
Office Applications
Network Applications
Site Management
Updaters and Utilities
Agriculture
Programs
ROI Calculators
Educational Partnership Program (USA)
Educational Partnership Program (EU)
Topcon Strategic Partner Program
BIM Resource Centre
Mass Data Collection Resource
Warranty Reimbursement Request Form
TotalCare
/
3D-MC & 3D-MC
2
Sitework ROI Calculator
Back to ROI Calculators
This form requires javascript enabled.
3D-MC & 3D-MC
2
Sitework ROI Calculator:
1a. = Production Payback - Project
1b. = Production Payback - Annual
2a. = Material Payback - Project
2b. = Material Payback - Annual
3. = Staking Payback
4. = Total Payback
= Enter information
= Calculated or fixed values
= Calculation totals
Units of measurement:
US / Imperial
Metric
Load default
US / Imperial
values
1a. Production Payback - Project
Project Area
Width (
ft.
):
Length (
ft.
):
Project size (
sq. ft.
):
Manual
3D-MC
3D-MC
2
Daily crew production (
sq. ft.
):
Number of passes to get to grade:
Number of passes reduced with 3D-MC:
3D-MC
2
percentage increase in speed:
%
Crew cost per day:
Number of days to grade project:
Crew cost for project:
Increase in productivity:
Production savings:
1b. Production Payback - Annual
Daily crew production (
sq. ft.
):
Crew cost per day:
Crew costs per
square foot
:
Number of passes to get to grade:
Number of passes reduced with 3D-MC:
3D-MC
2
percentage increase in speed:
%
3D-MC
3D-MC
2
Increase in productivity:
Savings per
square foot
:
Area graded annually (
sq. ft.
):
Total annual production savings:
2a. Material Payback - Project
Project size (
sq. ft.
):
With 3D-MC, thickness of material saved (
ft.
):
Cost per
ton
:
Material weight (
lb/cu. ft.
):
Material savings:
2b. Material Payback - Annual
Total
tons
of material laid:
Average cost per
ton
:
Total material costs:
Average thickness of material per lift (
ft.
):
With 3D-MC, thickness of material saved (
ft.
):
Percentage of material saved:
Savings in material costs:
3. Staking Payback
Project size (
sq. ft.
):
Number of surveyors:
Rate per hour:
Square feet
staked per 8 hour day:
Number of lifts requiring staking:
Total staking cost:
With 3D-MC, staking reduced by:
%
Savings in staking costs:
4. Total Payback
3D-MC
3D-MC
2
Production:
Material:
Staking:
Total project savings:
Days to finish project:
Savings per day:
MC system cost:
Payback in days:
Additional Payouts: Early Completion Bonuses
Print this page